Tasiast Gold Optimisation Project Upgrade
SGC Australia were awarded the plant wide design and commissioning of the Electrical switchboards, PLC and SCADA systems on Phase 1 of the Tasiast Expansion Project in Mauritania
Fortescue Solomon Power Station Construction
RTIO EII MCC Replacement Project
BHP MAC ST01 & ST02 Sustainability Project
Tasiast Gold Optimisation Project Upgrade
Fortescue Solomon Power Station Construction
251 kb
Cockburn Cement Munster Kiln 6 Tower 5 Shutdown
240 kb
BHP Yandi Stacker Zero Energy Decommissioning
351 kb
Cockburn Cement Munster CM3 General Shutdown
251 kb
Lexia Borefield SCADA Upgrade
136 kb
Mirrabooka Borefield SCADA Upgrade
147 kb
Merredin Pumping Station Dosing Improvements
194 kb
RTIO EII MCC Replacement Project
223 kb
BHP MAC ST01 & ST02 Sustainability Project
146 kb
Perth Transport Authority Project
151 kb
Hay Point Coal Terminal Stockyard Automation
185 kb
Paraburdoo Bridge Reclaimers Sustaining Works
188 kb
Mundaring Water Treatment Plant E&I
306 kb
Obuasi Gold Mine Upgrade
208 kb
Grand Cote Operations Senegal
136 kb
Nippon N-CHLO PILOT Plant
149 kb
Water Corporation Electrical Comms Upgrade
182 kb
Tasiast Gold Optimisation Project Upgrade
183 kb
Cape Lambert B Stockyard Automation
137 kb
Boseto Copper Plant
166 kb
Tutupan OPCC Overburden Stacking Facility
183 kb
Jaguar-Bentley Mine
145 kb
Sukari Gold Mine Project
135 kb
Karara Tailings Stacking Facility
175 kb
Ban Houayxai Gold & Silver Mine
254 kb
Tucano Gold Mine
231 kb
Solomon Mine
184 kb
Kwinana Bulk Terminal 2 Port Upgrade
166 kb
SGC Australia were awarded the plant wide design and commissioning of the Electrical switchboards, PLC and SCADA systems on Phase 1 of the Tasiast Expansion Project in Mauritania
The aim of this project is to increase the Stacking Capacity from 4,250 TPH to 6,500 TPH by the incorporation of a VVVF and multiple Structural / Mechanical Upgrades to the existing systems.
Decommissioning, replacement installation and commissioning of Seven (7) outdoor MCCs for thyssenkrupp Industrial Solutions as part of the Rio Tinto East Intercourse Island (EII) Stacker Replacement Project.
SG Controls were engaged to design, commission and manage the control system upgrades for the Obuasi Gold Mine as part of the recent mine expansion and modernisation.
Solomon Power Station is a gas-fired operation providing power to Fortescue’s Solomon Hub iron ore mining complex in the Pilbara region of WA.