Tasiast Gold Optimisation Project Upgrade

Our Involvement

E,I&C design, drafting, fabrication, installation and commissioning including:

  • Supervision of electrical switchboards, VSD and switchroom construction
  • (33kV down to 415V) in Jakarta –Indonesia
  • Programming/Configuration of HV protection relays, MV VSDs, LV VSDs, LV DOL Protection Relays
  • Factory Acceptance testing of switchboards, VSDs and switchrooms
  • As Building of drawings, QA/QC for all electrical equipment
  • Plant wide PLC and SCADA System:
    • Control paneling
    • Power Station Controls system
    • Perth based design and FAT
    • Site installation and commissioning
    • Control panels design and construction
    • Process control network and architecture design

Project Profile

SGC Australia were awarded the plant wide design and commissioning of the Electrical switchboards, PLC and SCADA systems on Phase 1 of the Tasiast Expansion Project in Mauritania. The project involved the design, fabrication, shipping, installation and commissioning of 10 switch-rooms, 30+ control panels requiring 200+ drawings for both the process plant and three power stations.

Phase 1 expansion of gold process:

  • Increase mill throughput from 8k to 12k t/day
  • Install a new Primary Crushing Facility
  • Install new SAG Mill and upgrade the Electrical systems to cope with the increased demand
  • Upgrade existing Ball Mills CIL and Floatation circuits
  • Increasing crushing and grinding facilities

Products Handled

Gold

Products Used

  • New Schneider M580 PLCs
  • New Schneider Altivar VSD controllers
  • New Schneider SCADA Wonderware
  • New Siemens Ruggedcom Network
  • switches RS2100
  • New Siemens Ruggedcom Network
  • switches i800
  • New Cisco Catalyst 2960-X Series
  • Switches
  • New HV and LV switchboards
  • Co-ordination of 3 independent power stations on islanded grid

You might also be interested in


Fortescue Solomon Power Station Construction

Solomon Power Station is a gas-fired operation providing power to Fortescue’s Solomon Hub iron ore mining complex in the Pilbara region of WA.
Read more

BHP MAC ST01 & ST02 Sustainability Project

The aim of this project is to increase the Stacking Capacity from 4,250 TPH to 6,500 TPH by the incorporation of a VVVF and multiple Structural / Mechanical Upgrades to the existing systems.
Read more

RTIO EII MCC Replacement Project

Decommissioning, replacement installation and commissioning of Seven (7) outdoor MCCs for thyssenkrupp Industrial Solutions as part of the Rio Tinto East Intercourse Island (EII) Stacker Replacement Project.
Read more